Container Terminals

ページ番号1001389  更新日 2017年10月27日 印刷 

Map: locations of the each container terminals

Terminal Details

Terminal Details
 

Tobishima Pier
Container Terminals

(North Terminal)

Tobishima Pier
Container Terminals

(South Terminal)

NCB
Container
Terminal
Nabeta
Pier
Container
Terminal
Tobishima
Pier
South Side
Container
Terminal
Total
Berth No. W90/91/92 W93/94 R1/2/3 T1/2/3 TS1/2 13 Berths
Berth Length (m) 620 700 900 985 750 3,955
Depth (m) 10-12 15 12 12-14 16 ---
Yard Capacity (TEU) 8,416 13,073 10,250 26,932 18,598 77,260
Terminal Area (m²) 171,105 227,772 288,379 549,686 361,549 1,619,664
Reefer Plug 110 140 189 288 240 967
Gantry Crane 3 5 6 8 6 28
Crane Outreach
(Rows)
13 16/17 16/17 17/18 22 ---
Throughput 2016
(TEU)
141,516 399,429 548,025 1,099,265 469,392 2,657,627

* The total container throughput includes the number of containers (in TEU) handled at non-container-designated terminals.